South Hummocks Renewable Energy Park
Building a Hybrid Energy Asset Around Grid, Land and Market Reality
The Challenge
A hybrid project is more complex than placing solar and batteries on the same site. Solar capacity, battery duration, grid import/export capability, charging strategy, land use and planning requirements all influence one another, so the project must be optimised as one integrated energy system.
OnyX’s Role
- Originated the opportunity and led development strategy across land, grid, technology and commercial optimisation.
- Assessed network capacity, import/export constraints, solar and storage sizing, dispatch strategy and solar-to-battery charging interaction.
- Used the four-hour BESS to create dispatch flexibility and additional energy and system-service revenue opportunities.
- Managed adjoining-land strategy and an iterative development process so capacity and layout can be refined as network and commercial information improves.
Development Outcome
South Hummocks demonstrates OnyX’s ability to shape multi-technology infrastructure where generation, storage, land and network capacity operate as one system. The project is progressing toward a technically feasible, commercially optimised and investment-ready hybrid renewable energy asset.
Capabilities
Ready to Develop Your Next Energy Infrastructure Project?
Bring us the opportunity. We’ll bring the development discipline — origination, risk control and hands-on delivery from land through to operations.